How we work
REV. A
SHEET 03/06

The Polar File

The package every project delivers.

The Polar File
CONTENTS 6
  1. 01

    Numbered, testable requirements, agreed before work starts

  2. 02

    A traceability matrix linking each requirement to its verification method and its evidence

  3. 03

    Versioned design files in openable formats — no lock-in

  4. 04

    Test reports and pre-compliance results

  5. 05

    Production documentation — BOM, assembly drawings, test procedures, fixture documentation

  6. 06

    Release manifest with revision history

Why this makes a fixed price safe

This is what makes a fixed price safe. The requirements list defines what 'delivered' means. Anything outside it is a change order, quoted separately.

Engineer probing a board while measuring waveforms on two oscilloscopes
OSCILLOSCOPE · 3:2
Stage deliverables
STAGES 4

Stage deliverables

What each stage of a full product engagement produces.

  1. 01

    Feasibility & Architecture

    • Requirements specification
    • System architecture
    • Technology selection
    • BOM cost model
    • Risk register
  2. 02

    Prototype

    • Schematic
    • Layout
    • First boards
    • Mechanical concept
    • Firmware bring-up
    • Functional demonstration
  3. 03

    Design for Production

    • DFM/DFA
    • Cost-down
    • EMC pre-compliance
    • Test strategy
    • Production fixtures
  4. 04

    Compliance & Handover

    • Accredited testing managed
    • Technical file
    • Release package
    • Transfer to your manufacturer

You can stop at any gate. We only ever fix-price one stage ahead.

Compliance
BLOCKS 3

Compliance

What we do in-house, what we manage for you, and what we don't offer.

Anechoic EMC chamber with absorber-lined walls and a test antenna
EMC PRE-COMPLIANCE
IN-HOUSE

In-house

  • Standards identification
  • Design for EMC and safety from the schematic onward
  • Pre-compliance measurement in our lab
  • Technical file
  • Declaration of Conformity
  • CE and UKCA support
MANAGED

Managed for you

Accredited EMC, safety, radio and environmental testing.

  • Lab selection
  • Booking
  • Test plan
  • Attendance
  • Failure analysis
  • Re-test management

You pay the lab directly; we run the process.

NOT OFFERED

Not offered

  • Regulatory ownership for medical devices (MDR, IEC 60601, ISO 13485)
  • Defence